RailForum.com
TrainWeb.com

RAILforum Post New Topic  Post A Reply
my profile | directory login | register | search | faq | forum home

  next oldest topic   next newest topic
» RAILforum » Railfans » Eastern US » Signals

   
Author Topic: Signals
Robert Muckey
Junior Member
Member # 63

Rate Member
Icon 1 posted      Profile for Robert Muckey   Author's Homepage     Send New Private Message       Edit/Delete Post   Reply With Quote 
I have one question for whome it may concern.
What do the Railroads do if a section of the mainline is experiencing a blackout from either manmade or mother nature do the railroads have a certain order for running trains duringblackout condition or what?

Posts: 18 | From: Lyons, New York USA | Registered: Jul 2000  |  IP: Logged | Report this post to a Moderator
rresor
Full Member
Member # 128

Rate Member
Icon 3 posted      Profile for rresor     Send New Private Message       Edit/Delete Post   Reply With Quote 
The standard rule if any signal is "dark" (not illuminated) is that it must be assumed to be displaying its most restrictive indication (which is "stop").

When automatic block signals (those with number plates) go dark, the usual rule is "stop and proceed at restricted speed, looking out for broken rail, switch not lined, or equipment on tracks". Thus a train will proceed at less than 20 mph (the legal definition of restricted speed), prepared to stop "within half the range of vision", stopping at each dark signal encountered, until it has passed through the area of signal failure.

At interlockings, if signals are dark a member of the train crew must "walk the plant" to verify that switches are lined and locked for the desired route. Permission must be received from the dispatcher to pass a red (or dark) home signal at an interlocking.

Any way you look at it, signal failures really foul up operations.


Posts: 614 | From: Merchantville, NJ. USA | Registered: Aug 2000  |  IP: Logged | Report this post to a Moderator
Throttle_JCKY
Full Member
Member # 354

Rate Member
Icon 1 posted      Profile for Throttle_JCKY   Author's Homepage     Send New Private Message       Edit/Delete Post   Reply With Quote 
He is correct. If the outage is man made and will be for a extended period of time, then there are other rules that will apply.
For example, some railroads might resort to track warrants or block authority. In Cincinnati when they built the 3rd main, we had to run on block authority. If it is mother nature, then all bets are off, and normally you run at restricted speed looking out ahead for whatever might or could be the cause. It isn't fun when mother nature causes the problems, because you never know what might be wrong ahead.

Posts: 62 | From: HC, IN, USA | Registered: Jan 2001  |  IP: Logged | Report this post to a Moderator
LightRail
Junior Member
Member # 633

Rate Member
Icon 1 posted      Profile for LightRail     Send New Private Message       Edit/Delete Post   Reply With Quote 
The same rules apply on our Light Rail system. DO NOT pass a dark signal. Stop short of the signal, call the Controller. The Controllere will grant restricted speed, red signal rules, call me from the next signal with the aspect. (red, yel, grn, or maybe also dark). Be on the lookout for broken rail, bad iron, and in our case grade crossing arms that may be malfunctioning. On 7 1/2 min headways that boogers up the system real fast. I don't even want to go into what happens during a power outage (we are in southern CA) that affects a large area.
Posts: 13 | From: La Mesa, CA. USA | Registered: Mar 2001  |  IP: Logged | Report this post to a Moderator
LARZ
Junior Member
Member # 839

Rate Member
Icon 1 posted      Profile for LARZ     Send New Private Message       Edit/Delete Post   Reply With Quote 
Boy...you guys are a little off.

Restricted speed is this by definition.

"A speed that will permit stopping within half the range of vision, short of a train, a car, on track equipment, a derail, a stop signal or an improperly lined switch. It must permit looking out for broke rail. It will not exceed 15 mph.

And when a signal goes dark that is some sort of intermediate signal with a numberplate...the rule is ...proceed at restricted speed. You no longer are required to stop. At interlockings it depends on which rr runs the interlocking...and what type of interlocking it is. there are many different procedures for running an interlocking under red.


Posts: 2 | From: jonesboro, ga | Registered: May 2001  |  IP: Logged | Report this post to a Moderator
   

Quick Reply
Message:

HTML is not enabled.
UBB Code™ is enabled.

Instant Graemlins
   


Post New Topic  Post A Reply Close Topic   Feature Topic   Move Topic   Delete Topic next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:


Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us