» RAILforum » Passenger Trains » Amtrak » Amtrak to reopen 3 N.Y. tunnels

   
Author Topic: Amtrak to reopen 3 N.Y. tunnels
Henry Kisor
Full Member
Member # 4776

Icon 1 posted      Profile for Henry Kisor   Author's Homepage     Send New Private Message       Edit/Delete Post   Reply With Quote 
From Media Relations today:

AMTRAK TO RE-OPEN THREE TUNNELS TO PENN STATION NEW YORK BY LATE FRIDAY, NOV. 9

Expanded train service north, south and west of NYC to follow

WASHINGTON - By late Friday, Nov. 9, Amtrak intends to re-open three tunnels that provide access to/from Penn Station New York (PSNY) which were significantly flooded and damaged by Hurricane Sandy. All Amtrak PSNY tunnels will then be in operation and will allow expanded Amtrak and commuter rail service north, south and west of New York City. Individual tunnels are expected to open at various times during the next three days.

"The return of all tunnel access to New York City will be a major milestone in the continued restoration of Amtrak and commuter rail service and for the larger recovery efforts of the Northeast region," said President and CEO Joe Boardman.

Two of the tunnels (known as Line 1 and Line 2) that will re-open this week are located under the East River and will support more Northeast Corridor service north of New York and Empire Service and other trains that operate to/from Albany and further west. When the two tunnels open, each will operate at 80 percent capacity, or at a peak level of about 32 trains per hour, as repairs continue. Two other East River tunnels did not flood and are operating at 100 percent capacity, or at a peak level of about 40 trains per hour.

The other tunnel (known as the North Tube) to re-open is located under the Hudson River and will allow expanded Amtrak and New Jersey Transit commuter rail service south of New York. In combination with the South Tube, which re-opened on Oct. 31, the two Hudson River tunnels will operate at about 63 percent capacity, or a peak of about 24 trains per hour which doubles the capacity of a peak of 12 per hour today. A normal peak is about 38 trains per hour.

The ability to further increase capacity through the Hudson River tunnels is currently limited by significant flooding damage at a key electrical substation located near Kearney, N.J. On Nov. 6, with the assistance of the Army Corps of Engineers, Amtrak brought the flooding under control and de-watered the facility. The equipment is now being cleaned and will be tested to determine the damage, the next course of action and estimated time for repair. Amtrak is able to bypass this substation, but because the power used for this section of track now has to supply a longer distance, the number of trains allowed to take power in the longer supply section is to be restricted in order to protect the catenary wires from over heating or tripping the supply breakers on overload until the substation is back on line for full restoration of service.

In addition, the 1930s-era electrical system was built by the Pennsylvania Railroad and inherited by Amtrak when it took control of sections of the Northeast Corridor in 1976. It uses unusual 25 Hz current; most modern electrical components are designed for 60 Hz current, thus limiting the ability to easily substitute electrical components or bring in alternate power sources.

The Hurricane Sandy storm surge flooded four of six 102-year-old tunnels under the Hudson and East Rivers for the first time in their history. In particular, signal and electrical systems in three of the four flooded tunnels were severely damaged by the salt water. Amtrak crews have designed a bypass for the signal system to allow the tunnels to re-open and provide safe operations, but more repairs are needed.

While Amtrak's Northeast Corridor received unprecedented levels of storm damage from Hurricane Sandy, investments made since 2002 helped mitigate the damage and are assisting in the recovery. For example, fire and life safety improvements in the New York tunnels including better emergency ingress/egress points and an enhanced ventilation system have supported the inspection process, de-watering / drying efforts and repair activities.

Posts: 2236 | From: Evanston, Ill. and Ontonagon, Mich. | Registered: Feb 2007  |  IP: Logged | Report this post to a Moderator
palmland
Full Member
Member # 4344

Member Rated:
5
Icon 1 posted      Profile for palmland     Send New Private Message       Edit/Delete Post   Reply With Quote 
Glad to hear, although my son is still stuck with a 2-3 hour commute rather than 50 min. on Mid-Town Direct service. He did get power back last night.
Posts: 2397 | From: Camden, SC | Registered: Mar 2006  |  IP: Logged | Report this post to a Moderator
   

Quick Reply
Message:

HTML is not enabled.
UBB Code™ is enabled.

Instant Graemlins
   


Post New Topic  Post A Reply Close Topic   Feature Topic   Move Topic   Delete Topic next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:


Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us