Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Amtrak Discussing Southwest Chief reroute with BNSF
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by RRCHINA: [QB] The recurring cost would be the connection to ALB from Belen and back through Isleta to Dalies or vice versa. It would be both time consuming and the turning of the train, twice daily, will require extra equipment and staff. Secondly, 90 MPH would not be necessary as 79 MPH would compare to the Transcon route (and many other LD routes). [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us