Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Gunn to be fired?
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by mikesmith: [QB] Upgrading track and adding double track is WAY cheaper than adding a new road, or even adding a new lane to an existing freeway; and the new track can be done in much less time. From San Antonio to Dallas, the average track speed is 35 mph. Upgrading that track to 79 mph would {obviously} cut down on the travel time. Fortunately, Texas just passed amendment 1, allowing the State to get involved with track upgrades and relocations. (Yea, everyone heard about amendment 2. The press ignored the other 8 amendments) We still need Interstate II ( from 1999). http://www.varprail.org/Interst2.htm [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us