Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
NARP Passenger Rail Map
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by 4020North: [QB] Mr. Delvy, be more specific about what economic analysis we need before we can go forward with a major expansion of Amtrak. How long does it take a major highway project to go through the process and be built? How long after they planned the Interstates did it take until they were largely completed? (Seems to me that that project was at least as ambitious as NARP's proposal would be.) This is a long-range goal, not a detailed plan for each individual segment. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us