RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » Passenger Trains » Amtrak » National Limited » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
Passenger Rail Fan
Member # 4899
 - posted
With the recent positive climate for AMTRAK...what are the chances for an addition of East/West service to St. Louis? Possibly the former National Limited route? We live in Illinois and a route like this would be great!
 
notelvis
Member # 3071
 - posted
Unlikely that Amtrak will be instituting any new long-distance service in the near-future. They don't have the rolling stock to equip much of anything beyond what they presently operate. As for the National Limited, parts of that trains' route through Ohio have been downgraded or even abandoned. It would have to serve a different route (like by-passing Dayton I think) if it did return.
 
irishchieftain
Member # 1473
 - posted
Part of the National Limited route through Pittsburgh (the Berry Street Tunnel) is now a piece of the West Busway.
 
rresor
Member # 128
 - posted
Well, that's not the only missing piece. The "Panhandle Bridge" that carried the St. Louis line out of Pittsburgh Penn Station across the Monongahela River is now a light rail line. Beyond Carnegie, most of the ROW to Mingo Junction is still in use, but unsignaled and downgraded. West from Mingo Junction (on the Ohio River) to Columbus, OH the former PRR belongs to the state and is the main line of the Ohio Central Railroad (single track, unsignaled). From Columbus to Richmond through Springfield, track is still in place but is (I think) unsignaled. From Richmond to Indianapolis it's gone altogether. West of there, the route to St. Louis is intact.

Putting back the missing pieces and putting together a route with reasonable running times would be expensive and time-consuming, and why bother for one train a day?

Finally, where would Amtrak find the equipment?
 
CG96
Member # 1408
 - posted
Also remember that in the case of unsignalled rail routes, the top speed for passenger trains is 59 mph. That's assuming that the railroad meets the other FRA and US Code standards for 59 mph track.
 



Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us