RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » Passenger Trains » Amtrak » CZ going to Omaha now?? » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
sutton
Member # 1612
 - posted
I heard from someone that the CZ was now going to/from Omaha, not just Denver. Can anyone confirm that? Thanks!
 
PullmanCo
Member # 1138
 - posted
The service alert on the Amtrak website is still to Denver, busstitution beyond.

Actually, there's some logic to Denver. There are multiple tracks in the station, which can be used to store trainsets (someone is going to have to clean and service them). Omaha, and I've used Omaha at least 4 times, doesn't have that.
 
Gilbert B Norman
Member # 1541
 - posted
WBBM 780's "Traffic and Weather on the Eights" 648AM segment today had a summary of the annullments, and noted the Chief E of KC, Zephyr E of Denver, and the Builder E of MPLS. The reporter further noted "Amtrak says find another way to go", which would suggest the bustitutions may not be offered much longer.
 
RRRICH
Member # 1418
 - posted
According to the AMTRAK web site this AM, both the SWC and the EB are expected to resume running their entire route as of tomorrow, 6/20 -- the CZ will apparently have "bustitution" for a few days longer
 
PullmanCo
Member # 1138
 - posted
Mr Rich's comment has been overtaken by events. Trackage on BNSF and CP is apparently taking longer to inspect, evaluate, repair, and certify than first thought. Most recent service bulletin says expect busstitutions until Amtrak says otherwise.
 



Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us