Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Railroad Adventures (RRAdventures) - 4 Days on the California Zephyr
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Stourbridge Lion: [QB] [b]Video #7 - Shoshone Tunnel #1 to Una Siding (MP 409.9)[/b] The next installment takes us through three more tunnels before reaching Glenwood Springs Depot; about 2 1/2 hours behind schedule. After a brief 10 minute stop where I could get out a take just a few quick shots we are off again. We will pass through New Castle (MP 372.7), Silt (MP 379.5), Rifle (MP 386.6), Rulison, and Parachute (MP 404) where many sidings exist. We travel right next to Interstate 70 and given the speed limit is 75MPH on the highway you can get a feel for the trains speed. [URL=http://www.youtube.com/watch?v=07FbBo3WSA8]YouTube - Amtrak #07[/URL] Duration: 8:58 [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us