Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Amtrak stimulus details
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Dakguy201: [QB] from the press release: "Other station projects Replacement of the existing Auto Train passenger station in Sanford, Fla., ($10 million) will be carried out, and the Wilmington, Del., station will receive more than $20 million for renovation." The new station is half the cost of renovating the old one? That doesn't seem to make a lot of sense, in particular considering that Sanford must handle a trainload of passengers at a time, but Wilmington's arrivals and departures are spread over the whole day. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us