Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Amtrak stimulus details
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Gilbert B Norman: [QB] Here's more detail now at the website: http://www.amtrak.com/pdf/ARRA/Amtrak-ARRA_Project-Summary-FY-09.pdf For those interested in rolling stock, ref Adobe P 67. Now please allow me leeway to "go political": that the Obama administration's ARRA '09 is clearly directing the "stimulus' funds towards the public sector, and most of such at Federal level, is indicative that a regulation minded Administration is now in town. But unfortunately, we are starting to learn that the Bush TARP initiative seemed to be going to "places unknown" and not necessarily to provide the recipient private sector financial institutions the intended liquidity to make small business and consumer loans. Safe assumption that Rush, Sean, Glen, and "BillO" are already ranting, but then so are Kieth and "Mad Cow" ranting about their rantings. But oh well, "RANTINGS = RATINGS". [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us