Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Southwest Chief reroute?
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by RRRICH: [QB] It sounds to me (and looks like on the maps) that the W-bd would back into ABQ from Dalies (about 20 miles, if I recall), do the ABQ stop, then proceed forward westbound like it always has. The E-bd would pull into ABQ as always, then back out to Dalies, then resume heading forward over the Transcon to points east. No turning of any cars required. Is that right? [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us