Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
New Viewliner Order
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by The Chief: [QB] Here are some pics of the guys on the [b]CAFUSA[/b] assembly line in Elmira, and materials, and almost a couple of pics of actual [b]Viewliners[/b]. Article says 1Q 2013 initial delivery: http://www.stargazette.com/apps/pbcs.dll/gallery?Site=CB&Date=20120127&Category=NEWS01&ArtNo=201270807&Ref=PH Local news story: http://www.stargazette.com/article/20120128/NEWS01/201280361/Made-Twin-Tiers-Wheels-rolling-CAF-USA?odyssey=nav|head "The final assembly building is where workers will install the electrical wiring, upholstered seating, beds, and cooking and dining facilities. The completed cars will then be attached to the wheel assemblies, which are provided by an outside vendor." [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us