Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Pullman Rail Journeys
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Gilbert B Norman: [QB] Something tells me that there is still Kubler-Ross Phase I (denial) on Clinton Street (IPH's HQ). Informing Window To The World Communications, Inc. that there may be a "delivery problem" with the Grand Prize is not yet on the radar screen. But the fact remains that IP tendered improperly inspected equipment to a Class I (Amtrak; yes it is a railroad) who in turn tendered it to a road over which they hold an operating contract (CN/IC) - and it came too close to a "really bad day". But to give credit where due, somewhere I learned that an alert PRJ Car Attendant's (they're back to that of so PI term of Porter) "railfan training" kicked in, pulled to cord, and the train stopped before resuming track speed after X-ing the UP/C&EI "diamond" at Tuscola. Begathons are live; the Illinois CPA Society "shanghaied" me once or twice during my career. I even once got on-air and also to sit at a cafeteria table with Marty Robinson and Ray Norstrand. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us