RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » Passenger Trains » Amtrak » Landslide near Everett WA hits the Empire Builder » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
Vincent206
Member # 15447
 - posted
No injuries, at least one car derailed. It looks like the front of the train was unaffected and the passengers were loaded into cars up front and the rest of train proceeded to Seattle. We've had lots of rain this weekend, so a service disruption wasn't unexpected, but wiping out part of the Empire Builder is a surprise.
 
Vincent206
Member # 15447
 - posted
This derailment was front page, headline news in The Seattle Times this morning. The headline screamed:
quote:
Amtrak derailment ‘like being thrown around like a rag doll’
Seems like that was a bit of an over-reaction.
 
notelvis
Member # 3071
 - posted
Hmnn........

I wish that they could figure out a way to stabalize that section of railroad during rainy season.
 
Vincent206
Member # 15447
 - posted
They (BNSF/WSDOT) are going to spend $16 million trying to figure out a fix. In case you haven't seen this video from last December, I'll repost it.
 
George Harris
Member # 2077
 - posted
quote:
Originally posted by Vincent206:
They (BNSF/WSDOT) are going to spend $16 million trying to figure out a fix. In case you haven't seen this video from last December, I'll repost it.

Read the report more carefully, it says, "$16.1 million in federal funding to identify, design and construct slope stabilization". Note the and CONSTRUCT the slope stabilization.

In the same report, "Project teams from WSDOT and BSNF are doing design and engineering work on a number of repair strategies like retaining walls, improved drainage systems and erosion control."

At least there seems to be more than going on than just talk. Two reasons: The appropriation includes money to actually do the fix, not just talk about, and the railroad companies are not in the habit of wasting money on studies unless it involves an issue they really intend to do something about.

Find out what happens if you try to get a lot of free information out of a railroad company to plug into one of the multitudinous enless transit studies. The essence of the response is usually something like, "Here is what we have easily available. If you want more bring your checkbook."
 



Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us