Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
This is NOT Going to Happen
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by palmland: [QB] Good idea Vincent, but why not keep it going to El Paso (something Gov. Richardson was contemplating). Then you'd connect to three of the transcons, although you gotta like TSR proposal. But, more realistically, why doesn't Amtrak just stop the studies and put on a thruway bus from LaJunta. Driving times from there to Pueblo-1'10", Colorado Sprgs.-1'45", Amtrak-Denver-2'50". That would be the best way to gauge demand and make a case to add a train. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us