Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
This is NOT Going to Happen
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Vincent206: [QB] If the Chief does get rerouted to the BNSF transcon, won't the connection to the old route be at Belen and not ABQ? Will the Chief make a diversion up to ABQ or will the passengers be bused the last miles or will there be a RailRunner connection provided? I could see some benefit to providing a guaranteed train connection to ABQ and Santa Fe via RailRunner. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us