Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Cascades Derailment
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Vincent206: [QB] We've now reached the one year anniversary of the deadly derailment. Cascades trains will remain on the water route until the NTSB final report is released and Amtrak and WSDOT have a chance to address all the concerns raised by the Board. WSDOT expects the move back to the Bypass will occur sometime next spring. Positive Train Control is activated and currently is being used by all Cascades, Sounder, BNSF and UP trains operating on the Cascades Corridor. Meanwhile, over 35 lawsuits stemming from the crash are working their way through the legal system. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us