RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » Model Railroading » Layout Design and Track Structures » What/how to judge grade % on hills??? » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
PTGCP
Member # 2029
 - posted
Planning layout and just starting benchwork...
I see references to % or degrees on hills/grade. Seldom in articles is more than 4% or 5% recommended or locomotives won't make it up the hill! But what is this calculation? (Us newbies don't understand) How do you judge/calculate this? I need to know in simple terms....literally how many inches "up" can I go in how many "inches" of track? What are the maximums before locos will have trouble pulling a dozen cars up the grade?
 
Challenger
Member # 1298
 - posted
A grade given as a percentage means that the number that is given in the percentage rises that number of units for every 100 units foward in travel.Example. A 4% grade rises 4 inches for every 100 inches of foward travel.

to give you some round numbers to work with. A 2% grade rises 1/2 inch in two feet of travel. 4% is 1 inch in same distance. I know the math is a little off. but the figures are very close for the stated percentage.
 

BridgeGuy
Member # 2246
 - posted
Your math is pretty good, Challenger....

By the way, on actual railroads the grade hardly ever exceeds 1% on mainlines (i.e. 1 ft rise for 100 ft travel). Steeper grades, say approaching 2%, can sometimes be found on lead and spur tracks. Using 1% grades or less on model railroads is not always practical, of course, because of layout space limitations.
 

cajon
Member # 40
 - posted
Notable exceptions to Bridgeguys 1% are the grades at Cajon, Tahachepi, Raton Glorieta & others out West. These range between 2-3% & are all mainlines.
 
Lloyd OBrien
Member # 2134
 - posted
Anyone know the grade that the Shay Engine can climb? This, of course is the unusual case, with the Shay being built for hauling logs up & down mountains on normally quite short runs.
 
bibbs68
Member # 2204
 - posted
Lloyd, if memory serves me correctly, They are capable of climbing up to 15% depending on load.
 
nscale_lover
Member # 2220
 - posted
Do I forsee a test ?
 
Cthetrains
Member # 2148
 - posted
TEST??????...holy gods, no!!!!!..please.... I am no expert by anyone's use of the term, but some of the terrain I have seen that used to be travelled by shays looked to be about 4%, maybe a bit more, but I'd say 5% would be a bit of a stretch. If I am wrong, please let me know..so I can correct the voices in my head, for future reference.

------------------
Cory (o:}=
 

Russ Bellinis
Member # 2377
 - posted
On the "Logger" tourist railroad near Yosemite National Park on hwy. 41 the shay there has a section of 14% grade on the tourist loop.
 
gary krieg
Member # 2958
 - posted
i use 1/2'' rise for every 12'' of track.
works great --- even helix ---no problems.
 
gary krieg
Member # 2958
 - posted
i use 1/2'' rise for every 12'' of track.
works great --- even helix ---no problems.
 



Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us