Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Railfans
»
Western US
»
Santa Ana Branch
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by bsme25: [QB] The rail gang has been working on laying rail on the long siding and the extension. Who would have ever dreamed that a siding on a branch would ever have such an upgrade! What a project Santa Ana and Olive Streets will be. I'm hoping that project is going to be put off for awhile as I'm sure that will spell the demise of the wig wag. As bumpy and chewed up as the asphalt gets around and between the street trackage, I really don't like the look of the concrete panels. Since Anaheim is going to put forth so much money into the historic redevelopment of the downtown area, it would be nice it they just accepted this rail line through this part of the city and incorporated some type of look and feel that would make it blend in with the project such as perhaps cobblestone! Just a far fetched dream. By the way, the flagmen are not UP MOW workers. They are basically minimum wage, non union workers from a private company. At least the ones I spoke with were. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us