Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Railfans
»
Western US
»
Santa Ana Branch
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by bsme25: [QB] The Monday Hauler arrived on time despite the derailment in Whittier. The Costa Mesa Local got a real late start Monday. It departed Anaheim at 0905 with the 905/Y1141 and 14 cars. Some type of construction started just beyond the engine spur at Anaheim Station. The barriers at the end of Adams St as well as the pavement has been removed. Perhaps extending the engine spur to make room for the RCL sled or adding a bumper? Just speculation. Today's Anaheim Hauler has not yet arrived. Went dead on the law in La Mirada. As of this posting at 0715 on Tuesday, the Costa Mesa has not yet departed Anaheim. Another late start. [URL=http://groups.yahoo.com/group/Orange_County_Railroad_Branches/]http://groups.yahoo.com/group/Orange_County_Railroad_Branches/[/URL] [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us