Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Railfans
»
Western US
»
Paramount/Bellflower Line
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by MPALMER: [QB] Went out on Saturday (7-12) to follow this line. Southeast of Woodruff the tracks are still in place except for at many of the grade crossings, where they have been cut around the sidewalk area both sides of the streets. Grade crossing signals are still in place at xings southeast of Woodruff. Salvage crew was at Stanton, using a large magnet to sort through the scraps in an old SP gondola. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us