Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
Starlight to KFS starting April 15
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by smitty195: [QB] I think one of the problems with "relying" on Amtrak and trying to read the tea leaves is that the fluidity of the issue up in the Cascades has so many people being told (and telling) various stories as to when the Coast Starlight can run the full route again. Several days ago when Mesaman was called by Amtrak to exchange his tickets, the situation was such that they weren't really sure when the train would go all the way through.......so they began having people exchange their tickets for the train-bus-train connection. However, the "rumor mill" now says May 2nd.....and this information came after the phone call to Mesaman. Sooooooo.......I think it's still more accurate to flip a coin at this point. However, don't be surprised if suddenly and out of the blue, the Starlight begins running all the way through in about 6 days. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us