Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
AmtrakCascades News
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by yukon11: [QB] I think the most needed change would be a train from Portland to Eugene which would get in at a reasonable hour. The earliest train, from PDX to EUG, now gets in at 8:50 PM. I wonder about WSDOT's plan for a high-speed train from Eugene to Vancouver, BC and back. It would take about 6 hours. I don't expect that to happen but it would be nice if it did. What about a through train, both Northbound and Southbound, from Eugene to Vancouver, BC with the present Cascades? They could extend 513, southbound from Vancouver, all the way to Eugene. It would probably arrive around 5:30 PM or 6:00 PM in Eugene. Likewise, train 504 now leaves Eugene at 9:00 AM. If they extended it to Vancouver, it could get in by early evening. Looking at the Cascades schedule, I don't see a real need for 507, Southbound, or 516, Northbound. Both could be deleted, in my opinion. It will be interesting to see the new schedules. I would be satisfied if the only change would be in the PDX to EUG timetable. Richard [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us