Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
AmtrakCascades News
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Vincent206: [QB] Amtrak's website is showing the 3rd northline trip, starting tomorrow, May 31st and operating until the Skagit River Bridge is fixed. The new train trip leaves Seattle at 815am and arrives Bellingham 1055am. The southbound trip leaves Bellingham at 515pm and arrives in Seattle at 755pm. These trips will be using Sound Transit Bombardier BiLevel coaches. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us