Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Passenger Trains
»
Amtrak
»
AmtrakCascades News
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by Vincent206: [QB] The summer construction season is underway in the Pacific Northwest and due to trackwork projects between Seattle and Vancouver BC, there has been a new schedule in effect since July 7th that [URL=http://www.amtrakcascades.com/Schedules.htm]adds 30 minutes to the Seattle to Vancouver BC trip times.[/URL] A large part of the construction should be for landslide prevention work, so these delays should result in more dependable service on the north line for Amtrak and Sound Transit once the rainy season starts. Amtrak's online timetables still show the old timetable, but the reservations page shows the new times operating through the end of September. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us