RailForum.com
TrainWeb.com

RAILforum Post New Topic  Post A Reply
my profile | directory login | register | search | faq | forum home

  next oldest topic   next newest topic
» RAILforum » Passenger Trains » Amtrak » Sunset Limited today?, What happened

   
Author Topic: Sunset Limited today?, What happened
Fan_Trains
Full Member
Member # 2874

Rate Member
Icon 1 posted      Profile for Fan_Trains   Author's Homepage     Send New Private Message       Edit/Delete Post   Reply With Quote 
hey gang,

well after checking the departure of today's #1, I received the "service disruption" message. does anyone know why?


Posts: 44 | From: Biloxi,Mississippi,USA | Registered: Nov 2003  |  IP: Logged | Report this post to a Moderator
Gilbert B Norman
Full Member
Member # 1541

Member Rated:
4
Icon 1 posted      Profile for Gilbert B Norman     Send New Private Message       Edit/Delete Post   Reply With Quote 
Date of origin from ORL, please Mr. Fan Trains.

Absent sharing that with the Forum, your inquiry is less than meaningless.


Posts: 9975 | From: Clarendon Hills, IL USA (BNSF Chicago Sub MP 18.71) | Registered: Apr 2002  |  IP: Logged | Report this post to a Moderator
snake
Full Member
Member # 2430

Rate Member
Icon 9 posted      Profile for snake     Send New Private Message       Edit/Delete Post   Reply With Quote 
There doesn't appear to be any train #1 operating at this time (today) anywhere between Orlando and LA. The last #1 to depart Orlando (5/27) arrived yesterday at LAX a mere 4:17 late.
Posts: 71 | Registered: Apr 2003  |  IP: Logged | Report this post to a Moderator
Pojon
Full Member
Member # 3080

Member Rated:
4
Icon 1 posted      Profile for Pojon   Author's Homepage     Send New Private Message       Edit/Delete Post   Reply With Quote 
Train No. 1 was disrupted because of the track work on the CSX being done for 6 weeks between Tallahassee and Jacksonville, Florida. The trains will resume with full service soon. Part of the route was temporarily run on dedicated bus service.

------------------


Posts: 287 | From: Palatka, FL, USA | Registered: Feb 2004  |  IP: Logged | Report this post to a Moderator
SilverStar092
Full Member
Member # 2652

Rate Member
Icon 1 posted      Profile for SilverStar092     Send New Private Message       Edit/Delete Post   Reply With Quote 
What are the dates for the trackwork? What dates will the Sunset not run east of New Orleans? I have a trip in a couple of weeks and Amtrak is bad about dispensing information.
Posts: 561 | Registered: Jul 2003  |  IP: Logged | Report this post to a Moderator
dixiebreeze
Full Member
Member # 3224

Rate Member
Icon 1 posted      Profile for dixiebreeze     Send New Private Message       Edit/Delete Post   Reply With Quote 
Me too, Silverstar. I think I read/heard, that the track work was to be completed by June 6. Hope so!
Posts: 133 | From: Florida, U.S.A. | Registered: May 2004  |  IP: Logged | Report this post to a Moderator
dixiebreeze
Full Member
Member # 3224

Rate Member
Icon 1 posted      Profile for dixiebreeze     Send New Private Message       Edit/Delete Post   Reply With Quote 
Found this, SilverStar:

Freight railroad company CSX will install new track on the line they own and operate between Tallahassee and Pensacola. This infrastructure upgrade will temporarily affect Amtrak service in the Southeast.

For a one-month period trains 1and 2, the westbound and eastbound Sunset Limited, will be canceled between New Orleans and Orlando. The effective dates are:

Train 1 canceled Orlando to New Orleans: 4/15, 4/22, 4/29, 5/6
Train 2 canceled New Orleans to Orlando: 4/11, 4/18, 4/25, 5/4
To accommodate passengers traveling between New Orleans, Orlando and intermediate stops, substitute bus service will be provided. Two express and one local bus connection will be offered in each direction as follows:

An express bus between New Orleans, Deland, Fla. and Jacksonville
An express bus between New Orleans, Pensacola and Orlando
A local bus between New Orleans and Orlando
A local bus between Jacksonville and New Orleans


Posts: 133 | From: Florida, U.S.A. | Registered: May 2004  |  IP: Logged | Report this post to a Moderator
snake
Full Member
Member # 2430

Rate Member
Icon 1 posted      Profile for snake     Send New Private Message       Edit/Delete Post   Reply With Quote 
Funny, today's scheduled arrival of #1 at LAX, previously a "service disruption" is now back to "normal":
quote:
As of the last report at 7:09 AM, at Maricopa, AZ, it was running 9 hours and 32 minutes late.

Update, 5:50 PM:

quote:
Estimated arrival: 14 hours and 36 minutes late.
As of the last report at 4:48 PM, at Yuma, AZ, it was running 15 hours and 39 minutes late.

[This message has been edited by snake (edited 06-02-2004).]


Posts: 71 | Registered: Apr 2003  |  IP: Logged | Report this post to a Moderator
amtraxmaniac
Full Member
Member # 2251

Icon 1 posted      Profile for amtraxmaniac     Send New Private Message       Edit/Delete Post   Reply With Quote 
It's about time they finish that work. Bustitution sucks!

------------------
Patrick


Posts: 387 | From: Bakersfield, CA | Registered: Jan 2003  |  IP: Logged | Report this post to a Moderator
   

Quick Reply
Message:

HTML is not enabled.
UBB Code™ is enabled.

Instant Graemlins
   


Post New Topic  Post A Reply Close Topic   Feature Topic   Move Topic   Delete Topic next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:


Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us